From Demolition to Details: How Long Your Bathroom Remodel Will Take

Remodeling a bathroom is one of the most rewarding home improvement projects you can undertake. Not only does it boost the value of your property, but it also enhances your everyday living experience. Whether you’re updating outdated fixtures or transforming the entire layout for a more functional design, one question inevitably comes up: How long will it take?

In this comprehensive guide, we’ll walk you through every stage of the remodeling timeline—from demolition to the final decorative touches. You’ll also learn how your choice of bathroom vanity, layout, and finishes can impact both the schedule and the final outcome.

Pre-Planning and Design (1–3 Weeks)

Before any tile is torn up or walls are opened, planning is everything. During this phase, you’ll make decisions that set the tone for the entire remodel.

Key steps:

  • Set a budget

  • Define your design style (modern, traditional, farmhouse, etc.)

  • Choose your main fixtures: toilet, tub, bathroom vanity, shower, lighting

  • Finalize layout changes (if any)

  • Hire a contractor or confirm if it’s a DIY job

If you’re opting for a vanity wall mount or a 30-inch floating vanity, now’s the time to make that call. Floating designs—especially in black-framed or minimalist styles—have become increasingly popular in modern bathrooms because they create the illusion of more space and make cleaning underneath a breeze.

Time-saving tip: Order products early. Many delays stem from waiting on key items like vanities, tiles, or custom glass.

Modern black bathroom vanity with toilet and soaking tub

Demolition (2–5 Days)

Once the plan is solid and materials are on order (or already delivered), it’s time to break ground—literally.

What happens during demolition:

Removal of old fixtures

Tearing out flooring and wall tiles

Disconnecting plumbing and electrical systems as needed

If your bathroom has a traditional built-in vanity, and you’re replacing it with a 30-inch floating vanity, this is where you’ll remove the old base cabinet and prepare the wall for mounting.

Pro tip: Protect adjacent spaces from dust and debris with plastic sheeting and plan for alternative bathroom use during this time.

Plumbing and Electrical Rough-In (2–4 Days)

Now that the space is gutted, behind-the-wall updates take place. Whether you’re repositioning the shower or upgrading your lighting, this is the moment to get everything wired and piped correctly.

Typical tasks:

  • Re-routing plumbing lines for new fixtures

  • Installing electrical outlets, switches, or additional lighting

  • Moving drain pipes for wall-mounted vanities

Wall-mounted vanities may require modifications to your plumbing, so make sure your contractor (or you, if it’s DIY) accounts for this in the timeline.

Bathroom plumbing and electrical layout demo wall display

Inspections (1–3 Days)

This is an essential pause in the process if you’re doing a full renovation. Local building codes may require inspections on plumbing and electrical work before you can close up the walls.

What to expect:

  • A visit from a local inspector

  • Minor delays if anything needs to be corrected

  • Peace of mind knowing everything is safe and up to code

Drywall, Painting, and Prep Work (3–5 Days)

Once inspections are cleared, it’s time to close up the walls and get the space ready for tiling and fixture installation.

Tasks during this phase:

  • Hanging and finishing drywall

  • Primer and paint application

  • Preparing surfaces for tile or flooring

This is also when the room starts looking like a bathroom again. Lighter paint colors or floating vanities can help small bathrooms feel more spacious and modern.

Tiling and Flooring (4–7 Days)

Tiling the shower walls, floors, or even creating a feature wall behind the vanity is one of the most transformative aspects of a remodel.

Expect this phase to include:

  • Floor tiling and grout

  • Shower wall or bathtub surround installation

  • Specialty tile features or backsplashes

This is also a good time to consider adding underfloor heating, especially if you live in a colder climate.

Fixture Installation (3–5 Days)

With the hard surfaces in place, your chosen fixtures are ready to be installed.

Installations may include:

  • Bathtub or shower system

  • Toilet

  • Lighting

  • Bathroom vanity and sink

  • Mirrors and shelving

If you’ve chosen a vanity wall mount, installation is more precise than for a traditional floor model. The height must be correct, the mount secure, and plumbing aligned perfectly.

A 30 inch floating vanity is ideal for compact spaces, offering the right blend of style and functionality without crowding the room.

Plumber fixing kitchen sink pipe under the cabinet

Final Touches and Clean-Up (1–2 Days)

You’re nearly done. Now’s the time to add the aesthetic elements that make your space feel truly finished.

Final details might include:

Caulking around tubs and sinks

Installing hardware (towel bars, toilet paper holders)

Styling the space with décor like candles or art

Deep cleaning to remove dust and residue

Total Time Estimate for a Full Bathroom Remodel

Here’s a breakdown of how long each phase may take:

Phase

Time Estimate

Planning & Design

1–3 weeks

Demolition

2–5 days

Plumbing & Electrical

2–4 days

Inspections

1–3 days

Drywall & Painting

3–5 days

Tiling & Flooring

4–7 days

Fixture Installation

3–5 days

Final Touches & Clean-Up

1–2 days

Total Estimated Time

3–6 weeks

Factors like product availability, contractor schedules, and permit approvals can extend this timeline, so always build in a buffer.

Why the Right Vanity Matters

The bathroom vanity isn’t just a storage unit—it’s a focal point. Choosing the right one can dramatically affect both the remodel timeline and the final aesthetic.

Considerations for a 30 Inch Floating Vanity:

  • Ideal for small to mid-sized bathrooms

  • Visually enlarges the space

  • Easier floor cleaning

  • Wall mounting may extend install time by a day if plumbing is adjusted

Why a Vanity Wall Mount is Worth It:

  • Lends a contemporary, spa-like feel

  • Offers flexibility for under-vanity lighting

  • Perfect for pairing with minimalist décor and modern finishes

Modern smart bathroom with toilet, glass shower and vanity setup

Final Thoughts

A bathroom remodel is a project that blends creativity with planning, and patience with precision. From demolition to finishing touches, the process typically takes 3 to 6 weeks, depending on the scope of your project and material choices.

Choosing a well-designed bathroom vanity—especially a 30 inch floating vanity or vanity wall mount—can help you maximize space, streamline cleaning, and align with your modern aesthetic.

Whether you’re renovating for comfort, resale, or personal satisfaction, the results are worth every step.

Frequently Asked Questions

Can I remodel my bathroom in stages to save time?

Yes, but it’s more efficient to handle everything at once if possible. Staging might help with budget control but often results in longer timelines.

Will installing a floating vanity add to the project time?

Slightly, especially if plumbing needs to be adjusted. But the long-term benefits in space and style often outweigh the extra effort.

How can I make a small bathroom remodel feel more luxurious?

Incorporate sleek features like a vanity wall mount, frameless glass shower, and matte black hardware. Lighting and mirror design also make a big impact.